Masonry
Mixing mortar
First formation block
Started as a first step .Level defining the wall and mixed with mortar. Align the level of along the wall to the right level and bring the clot blocks prepared mortar with a trowel before applying. Then the clot blocks the formation alignment and level has to facilitate the formation of the next layer. Blocks formation of each layer. Mortar must either block the formation of them and block to generate leads.
Arrange the blocks
The formation of reinforced concrete or steel pole
Formation blocks the beam or the floor
Equipment installation
2. Embedding conduits and plumbing.
1) In the case ,Blocked wall use the scraping tool groove / The Power Cutter Cutting depth is then used to extract block walls into the trenches for water pipes buried conduits. (Will be easier to brick. And concrete block). Groove depth should not exceed 1 in 3 of the previous blocks when installing pipe Or conduits then covered with cement.
2) Another case of installing conduits or plumbing before block formation. Except for the pipe, and then cement, sand enclosed vertical pipe.
Poles and lintel installation
| Height (meters) | Maximum Wall Length Without Tie Columns (meters) | |||||
|---|---|---|---|---|---|---|
| Block Thickness (cm) | ||||||
| 7.5 | 10 | 12.5 | 15 | 17.5 | 20 | |
| 2 | 5.6 | 8.7 | 10.9 | 12 | 12 | 12 |
| 2.25 | 5 | 8.7 | 10.9 | 12 | 12 | 12 |
| 2.5 | 4.2 | 8 | 9.6 | 12 | 12 | 12 |
| 2.75 | 3.8 | 7.3 | 9.2 | 11.8 | 12 | 12 |
| 3 | 3.4 | 6.7 | 8.9 | 11.5 | 12 | 12 |
| 3.25 | 3.1 | 6.2 | 8.6 | 11.2 | 12 | 12 |
| 3.5 | 3 | 5.4 | 8.3 | 10.8 | 12 | 12 |
| 3.75 | 2.9 | 4.8 | 8 | 10.5 | 12 | 12 |
| 4 | 2.8 | 4.6 | 7.7 | 10.2 | 12 | 12 |
| 4.25 | 2.6 | 4.3 | 7.4 | 9.9 | 12 | 12 |
| 4.5 | 2.5 | 4.1 | 7 | 9.6 | 12 | 12 |
| 5 | 2.2 | 3.9 | 6.4 | 9 | 11.5 | 12 |
| 5.5 | 2 | 3.6 | 5.8 | 8.3 | 10.9 | 12 |
| 6 | 1.8 | 3.3 | 5.1 | 7 | 10.2 | 12 |
Annotation :
1. For interior walls
2. Walls are not load-bearing. (Non-Loadbearing wall)
3. Walls without duct openings
4. Along the four walls attached to the pole. or beam along.
Installation pole and lintels
The cement plastering Airblock
Types of cement plaster
2. Cement plaster mixed type products such as tiger, TPI.
Cement plastering ready-made type products
Before plastered with cement walls must rise by at least 1 day. For the interior wall surface must be clean. and wetland reasonably not to absorb from the wall cement plaster too quickly. This can cracks and impair strength. and the making the wetland itself. It began with plaster.
2. Exterior wall. 3 days leave it plastering on the first layer, then 2nd layer plastering have to splash onto wet plastering on the first layer before the same.
Cement plastering of the points that are easy to crack
2. Boundaries between the walls and structure.
3. Vertical pipes and conduits.
To prevent cracking of plaster. Need to use steel wire mesh (Meter Mesh) strain on the surface plaster floor. The wider the line wire steel mesh cover. Each side of not less than 10 cm.